Eastbound I-90 milepost 82 to 83 near Cle Elum will have continuous single-lane closures with reduced speeds for concrete panel replacement Tuesday, Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m.
I-90 Work to Continue Through Sept. 30
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βI-90 Work to Continue Through Sept. 30β090 [24 mi from Ellensburg]: Eastbound I-90 milepost 82 to 83 near Cle Elum. Tuesday Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m. there will be a continuous single-lane closure with reduced speeds for concrete panel replacement.β
- βI-90 construction on milepost 82-83 near Cle Elum will continue until Wednesday, Sept. 30, with single-lane closures.β090 [24 mi from Ellensburg]: Eastbound I-90 milepost 82 to 83 near Cle Elum. Tuesday Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m. there will be a continuous single-lane closure with reduced speeds for concrete panel replacement.β
- βEastbound I-90 milepost 82 to 83 near Cle Elum will have continuous single-lane closures with reduced speeds for concrete panel replacement Tuesday, Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m.β090 [24 mi from Ellensburg]: Eastbound I-90 milepost 82 to 83 near Cle Elum. Tuesday Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m. there will be a continuous single-lane closure with reduced speeds for concrete panel replacement.β
Source text saved for this check (2026-09-28T07:01:03.704Z)
WSDOT highway construction and road closures within 50 miles of Ellensburg β 9/27/2026: 012 [23 mi from Ellensburg]: Both directions milepost 195 west of Yakima: Monday, Sept. 28 at 10 a.m. through Wednesday, September 30 at 12 p.m. noon. The Eschbach Road Intersection will be closed for roadway improvements. Detours are available via local roads. Effective: Sep 27, 2026, 9:25 PM Expected end: Sep 30, 2026, 12:00 PM 090 [24 mi from Ellensburg]: Eastbound I-90 milepost 82 to 83 near Cle Elum. Tuesday Sept. 29 at 6:30 a.m. through Wednesday, Sept. 30 at 4 p.m. there will be a continuous single-lane closure with reduced speeds for concrete panel replacement. Effective: Jun 21, 2026, 7:47 PM Expected end: Sep 30, 2026, 4:00 PM 012 [25 mi from Ellensburg]: Both directions milepost 199 west of Yakima. Until further notice. there will be continuous single-lane closures and 11-foot width restriction for roadwork. There will be flagger controlled traffic at the intersection of Ackley Road. Effective: Sep 13, 2026, 12:03 AM 090 [26 mi from Ellensburg]: Vantage Bridge milepost 136 to 138 both directions: There are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice. Eastbound width restriction begins at Exit 110, the junction of I-82 near Ellensburg. Westbound width restriction begins at Exit 149 the junction of SR 281 near George. Effective: Oct 26, 2025, 6:00 PM 281SPBURKE [34 mi from Ellensburg]: Travelers on SR 281 Spur in Grant County near George will encounter slowdowns and delays from Sept. 29 at 7 p.m. to Sept. 30 at 8 a.m. From milepost 2 to milepost 4. Expect alternating one-lane, two-way traffic with flaggers, reduced speed limits and temporary rumble strips while crews install pavement markings. Effective: Sep 24, 2026, 10:13 AM Expected end: Sep 30, 2026, 8:15 AM 002 [39 mi from Ellensburg]: Travelers on US 2 west of Cashmere will encounter single-lane closures in both directions while crews pave the roadway from milepost 105 to 109, Mondays through Fridays from 6 a.m. to 6 p.m. until early-to-mid-October. Dryden Ave., Alice Ave., and Saunders Rd. may be closed at times during the day only from Wednesday, Sept. 9, through early-to-mid-October. Local routes may serve as detours. Effective: Aug 10, 2026, 3:26 PM Expected end: Oct 15, 2026, 6:00 PM 012 [44 mi from Ellensburg]: Both directions milepost 155 White Pass. Until further notice, there will be alternating flag-controlled traffic 24/7, and an 11-foot width restriction for paving work. Expect some added travel time. Effective: Jul 19, 2026, 9:51 PM 002 [45 mi from Ellensburg]: Travelers on US 2 from milepost 94 at Tumwater Dam, five miles west of Leavenworth, to milepost 99, will encounter slowdowns and delays while crews install electrical and telecommunication facilities underground along the roadway. Expect one-lane, two-way traffic, with flaggers and pilot cars from 7 a.m. to 4 p.m., Mon-Fri until Oct. 30. Effective: Sep 25, 2026, 4:10 PM Expected end: Oct 30, 2026, 4:10 PM
The Ellensburg Wire is free. Get Ellensburg's news delivered every morning.