← The Ellensburg Wire
Infrastructure

Roadwork Delays Planned on Multiple WA Highways

πŸ”Š Listen Β· narrated by Aiden

WSDOT has announced multiple road closures and slowdowns affecting highways near Ellensburg, effective through September 2026. The most significant changes include alternating flag-controlled traffic on US 2 near Rimrock and White Pass, along with single-lane closures on Chumstick Highway and US 2 segments for paving and guardrail work.

The closures include a 19-mile stretch of Chumstick Highway from September 8-25 with weekday slowdowns, a US 2 segment near Orondo on September 8 with one-way traffic, and a 24/7 flag-controlled zone at White Pass until September 5. Travelers should expect delays, reduced speed limits, and single-lane closures during work hours.

WSDOT advises drivers to plan extra travel time and follow detour signs. The agency will provide updates through its website and electronic message boards.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 17 claims supported Β· 41%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT has announced multiple road closures and slowdowns affecting highways near EllensburgNo usable supporting receipt β€” unverified.
  • ⚠
    The road closures and slowdowns are effective through September 2026No usable supporting receipt β€” unverified.
  • ⚠
    The most significant changes include alternating flag-controlled traffic on US 2 near RimrockNo usable supporting receipt β€” unverified.
  • ⚠
    The most significant changes include alternating flag-controlled traffic on US 2 near White PassNo usable supporting receipt β€” unverified.
  • ⚠
    The most significant changes include single-lane closures on Chumstick Highway for paving and guardrail workNo usable supporting receipt β€” unverified.
  • ⚠
    The most significant changes include single-lane closures on US 2 segments for paving and guardrail workNo usable supporting receipt β€” unverified.
  • βœ“
    The closures include a 19-mile stretch of Chumstick Highway from September 8-25β€œ002 [42 mi from Ellensburg]: Travelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers.”
  • βœ“
    The closures include a 19-mile stretch of Chumstick Highway with weekday slowdownsβ€œ002 [42 mi from Ellensburg]: Travelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers.”
  • βœ“
    The closures include a US 2 segment near Orondo on September 8 with one-way trafficβ€œ002 [43 mi from Ellensburg]: Travelers on US 2 from milepost 137-139, just south of Orondo, will encounter slowdowns and delays on Sept. 8 from 7:30 a.m. to 4 p.m. while crews pave patches on the roadway. Expect alternating, one-way, two-lane traffic with flaggers and reduced speed limits.”
  • βœ“
    The closures include a 24/7 flag-controlled zone at White Pass until September 5β€œ012 [44 mi from Ellensburg]: Both directions milepost 155 White Pass. Until further notice, there will be alternating flag-controlled traffic 24/7, and an 11-foot width restriction for to paving work. Expect some added travel time. Effective: Jul 19, 2026, 9:51 PM Expected end: Sep 5, 2026, 11:50 PM”
  • βœ“
    Travelers should expect delays during the road closures and slowdownsβ€œBoth directions at milepost 168, east of Rimrock. There will be alternating flagged-controlled traffic for guardrail repair. Traffic is advised to expect delays through the area.”
  • ⚠
    Travelers should expect reduced speed limits during the road closures and slowdownsNo usable supporting receipt β€” unverified.
  • βœ“
    Travelers should expect single-lane closures during work hoursβ€œTravelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers.”
  • βœ“
    WSDOT advises drivers to plan extra travel timeβ€œExpect some added travel time.”
  • ⚠
    WSDOT advises drivers to follow detour signsNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT will provide updates through its websiteNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT will provide updates through electronic message boardsNo usable supporting receipt β€” unverified.

The Ellensburg Wire is free. Get Ellensburg's news delivered every morning.