WSDOT has announced multiple road closures within 50 miles of Ellensburg for construction work.
The closures include a continuous single-lane closure with a 12-foot width restriction on both directions between milepost 195 and 196 on a highway 23 miles from Ellensburg, effective October 6, 2026.