← The Ellensburg Wire
Infrastructure

WSDOT Road Work Affects Ellensburg Area

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced multiple road construction and closure projects affecting highways within 50 miles of Ellensburg, effective from September 2 through September 9, 2026.

The projects include alternating flag-controlled traffic at milepost 168 east of Rimrock, a right-lane closure on US 2 near Wenatchee, and repaving on Chumstick Highway from September 8 to 25. Other work includes paving patches on US 2 near Orondo and ongoing paving work at White Pass.

Travelers should expect delays, reduced speed limits, and single-lane closures during these projects. The White Pass work is scheduled to end September 5, while Chumstick Highway work continues through September 25.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts10 of 14 claims supported Β· 71%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    WSDOT announced multiple road construction and closure projectsβ€œWSDOT highway construction and road closures within 50 miles of Ellensburg β€” 9/4/2026:”
  • βœ“
    The road construction and closure projects affect highways within 50 miles of Ellensburgβ€œWSDOT highway construction and road closures within 50 miles of Ellensburg β€” 9/4/2026:”
  • ⚠
    The road construction and closure projects are effective from September 2, 2026No usable supporting receipt β€” unverified.
  • ⚠
    The road construction and closure projects are effective through September 9, 2026No usable supporting receipt β€” unverified.
  • βœ“
    The projects include alternating flag-controlled traffic at milepost 168 east of Rimrockβ€œ012 [34 mi from Ellensburg]: Both directions at milepost 168, east of Rimrock. There will be alternating flagged-controlled traffic for guardrail repair. Traffic is advised to expect delays through the area.”
  • βœ“
    There is a right-lane closure on US 2 near Wenatcheeβ€œTravelers on US 2 from milepost 118 to milepost 119 on Sept. 9 from 6:30 a.m. to 3:30 p.m. in north Wenatchee will encounter slowdowns and delays while crews pave rough spots on the roadway. Expect a right-lane closure, and detours.”
  • βœ“
    There is repaving on Chumstick Highway from September 8 to 25β€œ002 [42 mi from Ellensburg]: Travelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers.”
  • βœ“
    There are paving patches on US 2 near Orondoβ€œ002 [43 mi from Ellensburg]: Travelers on US 2 from milepost 137-139, just south of Orondo, will encounter slowdowns and delays on Sept. 8 from 7:30 a.m. to 4 p.m. while crews pave patches on the roadway. Expect alternating, one-way, two-lane traffic with flaggers and reduced speed limits.”
  • ⚠
    There is ongoing paving work at White PassNo usable supporting receipt β€” unverified.
  • βœ“
    Travelers should expect delays during these projectsβ€œBoth directions at milepost 168, east of Rimrock. There will be alternating flagged-controlled traffic for guardrail repair. Traffic is advised to expect delays through the area.”
  • ⚠
    Travelers should expect reduced speed limits during these projectsNo usable supporting receipt β€” unverified.
  • βœ“
    Travelers should expect single-lane closures during these projectsβ€œTravelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers.”
  • βœ“
    The White Pass work is scheduled to end September 5β€œEffective: Jul 19, 2026, 9:51 PM Expected end: Sep 5, 2026, 11:50 PM”
  • βœ“
    The Chumstick Highway work continues through September 25β€œ002 [42 mi from Ellensburg]: Travelers on 19-mile long Chumstick Highway, between US 2 (Leavenworth, milepost 100) and SR 207 (near Plain) will encounter slowdowns and delays Mondays through Fridays from 6 a.m. to 8 p.m. starting Sept. 8 until Sept. 25 while crews repair and repave the pavement. Expect single-lane closures, pilot cars and flaggers. Effective: Sep 3, 2026, 1:16 PM Expected end: Sep 25, 2026, 8:00 PM”

The Ellensburg Wire is free. Get Ellensburg's news delivered every morning.